This impressive development features a high-stud warehouse with gantry crane capability, paired with modern office space tailored to Vulcan’s operational needs. The design prioritised functionality, efficiency, and future scalability.
TW Property led the project from land acquisition and leasing through to design, consenting, and project management. TW Construction, supported by TW trades divisions, delivered a high-quality build, showcasing our fully integrated, end-to-end delivery model.
The warehouse structure uses efficient structural steel portal frames, creating a large column-free space ideal for Vulcan’s distribution requirements. Sustainability was a key focus, with low-carbon concrete and locally sourced materials helping to reduce the project’s overall embodied energy.